Agricultural Equipment Flatbed Shipping

July 20, 2026
Agricultural Equipment Flatbed Shipping

Agricultural equipment flatbed shipping runs on a calendar that does not move. A planter has to reach the farm before the ground is ready. A dealer needs mowers on the lot before spring. Miss the window and the equipment sits until next season.

MigWay is an asset-based carrier based in Pineville, NC, with 400 trucks and 750 trailers. Our trailers are all 53 ft: flatbed, conestoga and dry van. This guide covers what ag equipment fits that fleet, what does not, how permits and securement work, and what a load costs in 2026.

What is happening in ag equipment freight in 2026?

New equipment sales are soft, and more of the freight is dealer stock, used units and parts. The Association of Equipment Manufacturers (AEM) numbers tell the story:

  • U.S. farm tractor sales through August 2026 totaled 119,889 units, down 12.4% from the same period in 2025.
  • Four-wheel-drive tractor sales fell 24.4% year to date, to 1,209 units.
  • Self-propelled combine sales were down 9.1% year to date, at 2,063 units.
  • In September 2026 alone, U.S. tractor sales dropped 16.4% and combine sales fell 10.9% compared with a year earlier.

Dealers started August with 95,179 farm tractors in inventory. When retail slows, shipping shifts toward moving stock between lots, repositioning used equipment and keeping parts flowing.

A lot of that freight starts in the Southeast. Kubota Manufacturing of America builds subcompact tractors, mowers and utility vehicles in Gainesville, GA, and Kubota Industrial Equipment makes loaders and implements in nearby Jefferson, GA. AGCO is headquartered in Duluth, GA. Those plants sit on I-85, a straight shot to dealers across the Carolinas and Virginia.

What agricultural equipment fits on a 53 ft flatbed?

Anything that stays under about 8 ft 6 in tall on the deck and fits within weight limits. A 53 ft flatbed deck sits roughly 5 ft off the ground, and most eastern states cap total height at 13 ft 6 in.

Good fits for MigWay equipment

  • Subcompact and compact tractors, with the ROPS folded if needed
  • Zero-turn and commercial mowers
  • Utility vehicles and side-by-sides
  • Skid steers and compact track loaders
  • Loaders, backhoe attachments, buckets, forks and pallet forks
  • Tillage tools, rakes, tedders, balers and mowers folded to transport width
  • Grain carts and wagons that clear the height limit
  • Grain bin components, augers in sections and irrigation pipe
  • Crated parts, tires, wear parts and dealer service stock

Loads that need a different trailer

MigWay does not run step decks, double drops or RGNs. That rules out most combines, large four-wheel-drive tractors, high-clearance sprayers and cab tractors whose highest point would sit above 8 ft 6 in on the deck. Measure the tallest point, whether that is a cab roof, exhaust stack, beacon or folded wing tip. If the math does not work, dispatch will say so on the first call.

Flatbed, conestoga or dry van for ag freight?

Choose by how the equipment loads and whether it can get wet. MigWay runs all three trailer types in 53 ft lengths.

Trailer (53 ft) Usable cargo height Typical payload How it loads Best ag fit
Flatbed About 8 ft 6 in About 48,000 lb Forklift, crane or loading dock from any side Compact tractors, implements, skid steers, bin parts, irrigation pipe
Conestoga About 8 ft (96 to 102 in, varies by trailer) About 42,000 to 44,000 lb Like a flatbed, after the rolling tarp slides back New dealer stock, mowers and utility vehicles that should arrive clean and dry
Dry van About 9 ft inside, less at the door About 45,000 lb Dock, through rear doors Crated parts, tires, filters, seed equipment components

The conestoga earns its keep on new equipment. A dealer receiving 12 new mowers wants them free of road grime, and nobody wants to scrub a cab after a rainy 400-mile run. Our conestoga trailer guide explains how the rolling tarp system works.

How do width and folding affect permits?

Width is what pushes most ag loads into permit territory. The legal limit on the Interstate system is 8 ft 6 in, and many implements run wider than that unless they fold.

Ship at transport width, not field width

A rake or tillage tool that spans 20 ft in the field may fold to near-legal width for the road. Confirm that wings are folded and pinned before the truck arrives. That one step can turn a permitted load into a legal one and save a day or more. On the intake call, dispatch asks for transport width, not field width.

When a permit is needed

Over-width loads that still fit under the height limit can move on a 53 ft flatbed with state permits. Each state on the route issues its own permit with its own rules:

  • Many states allow oversize movement only in daylight.
  • Most restrict weekend and holiday travel for oversize loads.
  • Escort and pilot car thresholds differ by state, so a load can need an escort in one state and run clear in the next.
  • Permits often take 1 to 2 business days, longer during spring and harvest peaks.

Permit and escort costs are quoted into the flat all-in rate before the load books.

When are the busiest seasons for ag equipment shipping?

Late winter through spring, then late summer into fall. Plan around these windows:

  • Late winter and spring: tractors, planters, tillage tools, mowers and utility vehicles head to dealers and farms before planting and mowing season.
  • Late summer and fall: harvest equipment, grain carts, augers and bin parts move ahead of the cut.
  • Auction season: farm auctions cluster in late winter and after harvest, with hard pickup deadlines.
  • Off-peak: dealer restocking and used equipment moves fill the rest of the year with more schedule room.

During peaks, trucks and permit offices both get busy. MigWay dispatch plans backward from the field or sale date instead of forward from pickup. For a breakdown in the middle of planting or harvest, expedited service puts a truck under a replacement unit in 4 hours.

How is farm equipment secured on a flatbed?

Equipment weighing 10,000 lb or more falls under FMCSA 49 CFR 393.130. Lighter units follow the general cargo rules in 393.100 through 393.114.

Units of 10,000 lb or more

  • At least four tiedowns, each attached at a separate point, restraining forward, rearward and side-to-side movement
  • Chains and binders attached at the frame or rated tie points, not at axles or hydraulic lines
  • Buckets, blades and other accessories lowered to the deck and secured
  • Articulated units locked so they cannot pivot

Lighter equipment and attachments

The combined working load limit of all tiedowns must equal at least half the cargo weight. Mowers and compact units get chocked, since pneumatic tires flex and let a unit shift as chains settle. Folding wings get pinned in transport position and strapped so they cannot open on the highway.

Drivers recheck securement within the first 50 miles, then every 150 miles or 3 hours. Tires settle, and a chain that was tight at the dealer can have slack an hour later.

How does loading and farm delivery work?

A 53 ft flatbed deck sits about 5 ft high. A self-propelled tractor or skid steer needs a loading dock, an end ramp or a crane to get on and off. Implements, attachments and non-running units go on by forklift, telehandler or crane.

The driver does not operate customer equipment. Someone at the dealer or farm drives or lifts it on and off.

Farm deliveries need more planning than a paved dealer lot. Dispatch checks these points before the truck rolls:

  • Can a 70 ft tractor-trailer get down the farm road and turn around? Low bridges, tight gates and soft shoulders are common.
  • Is the unload area firm and dry? A loaded flatbed stuck in a wet field entrance means a tow bill.
  • What equipment is on site to unload, and who will run it?
  • Are there low power lines or tree limbs along the route in?
  • Will someone be there to sign during the delivery window?

Which ag equipment lanes does MigWay run?

MigWay covers the East Coast from New England to Florida, the Southwest and parts of the Midwest. Ag volume runs from Southeast and Midwest manufacturing into dealer networks and farm regions.

Origin Destination Route Approx. miles
Gainesville, GA Charlotte, NC I-985 to I-85 210
Jefferson, GA Raleigh, NC I-85 350
Charlotte, NC Richmond, VA I-85 290
Louisville, KY Atlanta, GA I-65 to I-24 to I-75 420
Columbus, OH Lancaster, PA I-70 to I-76 415
Chicago, IL Indianapolis, IN I-65 185
Kansas City, MO Indianapolis, IN I-70 485
Scenario Typical transit Notes
Under 300 miles Same day Loaded and delivered inside one driver's hours
300 to 600 miles 1 day 12 to 24 hour standard lead time
600 to 1,100 miles 2 days One rest stop, live tracking throughout
Expedited Truck in 4 hours Breakdown during planting or harvest
Over-width, permitted Add 1 to 2 days Permits plus daylight-only travel, longer in peak season

What does agricultural equipment shipping cost in 2026?

MigWay ag equipment rates run $3.00 to $4.00 per mile on the lanes below, with flat all-in figures starting at $1,500. Fuel and all standard charges are included. One number up front, no add-ons.

Origin Destination Rate Flat all-in
North Carolina Ohio, Indiana, Kentucky, Michigan $3.00/mi $1,700
North Carolina New York, Pennsylvania, Delaware $3.75/mi $1,850
Ohio, Indiana, Kentucky, Michigan Alabama, Georgia, Tennessee, Mississippi $4.00/mi $2,000
Ohio, Indiana, Kentucky, Michigan Maryland, Virginia, the Carolinas, West Virginia, DC $4.00/mi $2,000
Ohio, Indiana, Kentucky, Michigan New York, Pennsylvania, Delaware $4.00/mi $2,000
Illinois, Missouri, Nebraska, Kansas Indiana, Ohio, Kentucky, Michigan $3.50/mi $1,900
Pennsylvania, New York, Delaware Maryland, Virginia, the Carolinas, West Virginia, DC $3.00/mi $1,600
Same-region moves - - $1,500

Loads delivering into Florida run $5.00 per mile, all-in. Permits and escorts for over-width loads are quoted into the flat number before booking.

For market context, DAT reported national flatbed spot linehaul near $2.61 per mile in late October 2026, with its bellwether flatbed states up 28.8% from a year earlier. Those figures exclude fuel, so compare them against total cost per load, not against an all-in rate.

How does an ag load run from booking to delivery?

  1. Intake: unit type, transport height and width, weight, running or not, deadline, and farm access go into the first call. Standard lead time is 12 to 24 hours, and expedited puts a truck under the load in 4 hours.
  2. Trailer and driver: dispatch runs the height and width math and picks flatbed, conestoga or dry van. Every MigWay driver has at least 2 years of recent OTR experience.
  3. Permits: over-width loads get permits and escort plans lined up before pickup.
  4. Loading: the driver checks that wings are pinned, chocks the unit, applies chain or strap securement and secures attachments separately.
  5. In transit: ELD and GPS give live tracking on every load, with securement checks at 50 miles and every 150 miles after.
  6. Delivery: the driver confirms the unload plan on arrival. The POD comes back the same day.

One dispatcher owns the load from start to finish. Zero outsourcing means the person who scoped your permit is the same person who answers when a state closes a route.

Why ship ag equipment with MigWay?

  • Asset-based: 400 company trucks and 750 trailers, no loads posted to a broker board
  • Flatbed, conestoga and dry van in 53 ft lengths, so equipment and parts ride on the right trailer
  • Flat all-in rates, with permits and escorts quoted into one number
  • 24/7 in-house dispatch with live people during planting and harvest
  • Live tracking through ELD and GPS on every load
  • Drop trailer and EDI for dealers and manufacturers on a routing guide

Not sure whether to use a carrier or a broker for seasonal freight? Read why choose an asset-based carrier. For larger construction machinery, see machinery and heavy equipment flatbed hauling.

Agricultural equipment flatbed shipping comes down to honest height math, permits pulled early and a truck that beats the seasonal deadline. Get a flat all-in quote or start a chat on our website. Dispatch is also available at +1-980-255-3200.

Frequently Asked Questions

Can MigWay ship a combine?

Usually not. Most combines are too tall for a 53 ft flatbed and need a step deck or lowboy, which MigWay does not run. We can haul combine parts, attachments and smaller harvest equipment that stays under about 8 ft 6 in on the deck.

What size tractor fits on a 53 ft flatbed?

Subcompact and compact tractors usually fit, often with the ROPS folded. Larger cab tractors often stand too tall once on a deck that sits about 5 ft high. Measure the highest point and send it with your quote request so dispatch can confirm.

Should I ship an implement folded or unfolded?

Folded, whenever the implement allows it. Folding can bring a wide tool down to near-legal transport width, which may avoid permits and save a day or more. Make sure wings are folded and pinned before the truck arrives.

When does farm equipment need an oversize permit?

When it runs wider than 8 ft 6 in or taller than the state height limit, usually 13 ft 6 in in the East. Each state on the route issues its own permit, with its own travel hours and escort rules. MigWay quotes permit and escort costs into the flat rate.

Why use a conestoga for new ag equipment?

A conestoga loads like a flatbed but covers the cargo with a rolling tarp system. New mowers, utility vehicles and compact tractors arrive at the dealer clean and dry. The tradeoff is about 8 ft of inside height and a payload near 42,000 to 44,000 lb.

How is ag equipment secured on a flatbed?

Units of 10,000 lb or more need at least four tiedowns at separate points under FMCSA 49 CFR 393.130. Lighter equipment needs tiedowns with a combined working load limit of at least half its weight. Attachments are lowered and secured, and folding wings are pinned.

Who unloads equipment at a farm?

Someone at the farm or dealer. MigWay drivers do not operate customer equipment. Self-propelled units need a dock, ramp or crane to come off a 53 ft flatbed, and implements need a forklift, telehandler or crane.

What does agricultural equipment shipping cost?

MigWay rates on common ag lanes run $3.00 to $4.00 per mile, with flat all-in figures starting at $1,500. Fuel and standard charges are included, and permits are quoted into the same number. Florida deliveries run $5.00 per mile all-in.

How fast can MigWay get a truck for ag equipment?

Standard lead time is 12 to 24 hours. Expedited service puts a truck under the load in 4 hours for a breakdown during planting or harvest. Permitted over-width loads add 1 to 2 days, and more during peak season.

Where does MigWay haul agricultural equipment?

MigWay covers the East Coast from New England to Florida, the Southwest and parts of the Midwest. Common lanes run from Georgia, Kentucky, Ohio and Illinois into dealer networks in the Carolinas, Virginia, Pennsylvania and Indiana.

Want to drive with us?

Join the team Get a Quote
**Please be aware of scammers impersonating MigWay via email.

Any legitimate email from us will have an "@migway.com" domain.**