Machinery and equipment

Machinery and Equipment Transport

Machinery is expensive, top-heavy and often too tall for an enclosed trailer. We move it on flatbeds and Conestogas, secured to code and protected from the weather.

EquipmentFlatbed and Conestoga
Lead time12–24 hrs
Expedited4 hrs
Dispatch24/7

Common problems

What gets in the way of machinery & equipment freight

01

High-value freight

The problemOne piece of machinery can be worth more than the truck that carries it.

How we handle itDrivers secure it to federal cargo securement rules, and live tracking shows the load the whole way.

02

Weather exposure

The problemRain and road spray damage controls, electrical parts and finishes.

How we handle itA Conestoga covers the entire load, and open-deck machinery is tarped before it leaves.

03

Loading without a dock

The problemMachinery is loaded by forklift or crane from the side or top, not at a dock.

How we handle itFlatbeds and Conestogas open fully for side and overhead loading.

04

Tight delivery dates

The problemInstallation crews and plant shutdowns are scheduled around the delivery.

How we handle itWe plan the run from your delivery date, and expedited service covers the urgent moves.

What we haul

Machinery & equipment freight we move

Industrial machinery

Presses, CNC machines, compressors and production equipment.

Flatbed

Crated equipment

Crated and skidded machinery and parts.

Conestoga

Electrical equipment

Transformers, switchgear and generators that must stay dry.

Conestoga

Truck and equipment parts

Axles, engines, frames and heavy components.

Van or flatbed

Agricultural equipment

Implements and attachments within legal dimensions.

Flatbed

Who books with us

  • Equipment manufacturers
  • Industrial plants
  • Equipment dealers
  • Machine shops

Full Truckload Rate Calculator

!
!

Equipment and services

Built around your freight

Two MigWay trucks facing the camera

Flatbed

An open deck for freight that loads from the side or top, chained or strapped to federal securement rules.

Side and top loadingTarps

Conestoga

A flatbed with a rolling tarp system. It loads from the side like a flatbed and covers the freight like a van.

Rolling tarpSide loading

Expedited

When a load cannot wait, we can have a truck ready in as little as 4 hours.

4-hour responseDirect run

24/7 dispatch and tracking

In-house dispatch around the clock, with live ELD and GPS tracking on every truck.

24/7ELD and GPS

How a load moves

From quote to delivery

  1. 1

    Get a rate

    Enter the pickup and delivery ZIP codes in the calculator. You get one all-in number with fuel included.

  2. 2

    Plan the load

    Dispatch confirms the trailer, the weight and your pickup and delivery appointments.

  3. 3

    Pickup and transit

    One driver and one truck from pickup to delivery, tracked live by ELD and GPS.

  4. 4

    Delivery

    The truck arrives on your appointment, and proof of delivery comes back to you.

Questions

Machinery & equipment shipping, answered

What equipment do you use for machinery?

Flatbeds and Conestogas. A Conestoga is a flatbed with a rolling tarp system that covers the whole load and still opens for side and overhead loading.

Do you haul oversize machinery?

We haul legal-size loads. If your machine is over legal width or height, ask dispatch before you book.

How do you secure machinery?

Drivers chain or strap each piece to federal cargo securement rules and recheck it during the trip.

Can you protect electrical equipment from rain?

Yes. Switchgear, generators and other moisture-sensitive equipment ride on a Conestoga or under tarps.

Can you move machinery on short notice?

Yes. Expedited service can have a truck ready in as little as 4 hours for a plant shutdown or a breakdown.

**Please be aware of scammers impersonating MigWay via email.

Any legitimate email from us will have an "@migway.com" domain.**