Construction

Construction Freight and Job Site Delivery

On a job site, the crew and the crane are waiting on your truck. We haul construction materials and equipment on flatbeds and Conestogas, timed to the schedule.

EquipmentFlatbed and Conestoga
Lead time12–24 hrs
Expedited4 hrs
Dispatch24/7

Common problems

What gets in the way of construction freight

01

Crews waiting on freight

The problemA late load leaves a crew and a rented crane standing around.

How we handle itWe plan the run from your site delivery time and track the truck live, so the superintendent knows when it arrives.

02

Tough site access

The problemJob sites have tight gates, soft ground and no loading dock.

How we handle itTell us about the site when you book. Flatbeds and Conestogas unload from the side or the top, right where the forklift or crane is.

03

Weather

The problemRain damages lumber, drywall and electrical gear before it is installed.

How we handle itMoisture-sensitive freight rides on a Conestoga or under tarps.

04

Project schedules that change

The problemDelivery dates move as the project moves.

How we handle itOur 24/7 dispatch reschedules with you, and expedited service covers the loads that cannot wait.

What we haul

Construction freight we move

Structural steel and rebar

Beams, columns, joists and bundled rebar.

Flatbed

Lumber and framing

Framing lumber, trusses, plywood and OSB.

Conestoga

Electrical and mechanical gear

Switchgear, HVAC units and generators for commercial projects.

Conestoga

Pipe and conduit

Steel, ductile iron and plastic pipe and conduit.

Flatbed

Data center components

Racks, cooling units and power equipment for data center builds.

Conestoga

Who books with us

  • General contractors
  • Subcontractors
  • Steel erectors
  • Construction suppliers

Full Truckload Rate Calculator

!
!

Equipment and services

Built around your freight

Two MigWay trucks facing the camera

Flatbed

An open deck for freight that loads from the side or top, chained or strapped to federal securement rules.

Side and top loadingTarps

Conestoga

A flatbed with a rolling tarp system. It loads from the side like a flatbed and covers the freight like a van.

Rolling tarpSide loading

Expedited

When a load cannot wait, we can have a truck ready in as little as 4 hours.

4-hour responseDirect run

24/7 dispatch and tracking

In-house dispatch around the clock, with live ELD and GPS tracking on every truck.

24/7ELD and GPS

How a load moves

From quote to delivery

  1. 1

    Get a rate

    Enter the pickup and delivery ZIP codes in the calculator. You get one all-in number with fuel included.

  2. 2

    Plan the load

    Dispatch confirms the trailer, the weight and your pickup and delivery appointments.

  3. 3

    Pickup and transit

    One driver and one truck from pickup to delivery, tracked live by ELD and GPS.

  4. 4

    Delivery

    The truck arrives on your appointment, and proof of delivery comes back to you.

Questions

Construction shipping, answered

Do you deliver directly to job sites?

Yes. Flatbeds and Conestogas unload from the side or top, so a site with a forklift or crane can receive without a dock. Tell us about site access when you book.

Can you deliver on a specific day for a crane lift?

Yes. We plan the run from your delivery time and track the truck live. Dispatch keeps you updated so the crane is not waiting.

Do you haul data center construction freight?

Yes. Racks, cooling units, switchgear and power equipment ride on Conestogas or under tarps to keep them dry.

What construction materials do you haul?

Structural steel, rebar, lumber, trusses, pipe, conduit, electrical gear and HVAC equipment, all within legal size.

What if the site delivery date changes?

Dispatch works 24/7 and reschedules with you. For loads that cannot wait, expedited service can have a truck ready in as little as 4 hours.

**Please be aware of scammers impersonating MigWay via email.

Any legitimate email from us will have an "@migway.com" domain.**