Construction
Construction Freight and Job Site Delivery
On a job site, the crew and the crane are waiting on your truck. We haul construction materials and equipment on flatbeds and Conestogas, timed to the schedule.
Common problems
What gets in the way of construction freight
Crews waiting on freight
The problemA late load leaves a crew and a rented crane standing around.
How we handle itWe plan the run from your site delivery time and track the truck live, so the superintendent knows when it arrives.
Tough site access
The problemJob sites have tight gates, soft ground and no loading dock.
How we handle itTell us about the site when you book. Flatbeds and Conestogas unload from the side or the top, right where the forklift or crane is.
Weather
The problemRain damages lumber, drywall and electrical gear before it is installed.
How we handle itMoisture-sensitive freight rides on a Conestoga or under tarps.
Project schedules that change
The problemDelivery dates move as the project moves.
How we handle itOur 24/7 dispatch reschedules with you, and expedited service covers the loads that cannot wait.
What we haul
Construction freight we move
Structural steel and rebar
Beams, columns, joists and bundled rebar.
Lumber and framing
Framing lumber, trusses, plywood and OSB.
Electrical and mechanical gear
Switchgear, HVAC units and generators for commercial projects.
Pipe and conduit
Steel, ductile iron and plastic pipe and conduit.
Data center components
Racks, cooling units and power equipment for data center builds.
Who books with us
- General contractors
- Subcontractors
- Steel erectors
- Construction suppliers
Full Truckload Rate Calculator
Equipment and services
Built around your freight

Flatbed
An open deck for freight that loads from the side or top, chained or strapped to federal securement rules.
Conestoga
A flatbed with a rolling tarp system. It loads from the side like a flatbed and covers the freight like a van.
Expedited
When a load cannot wait, we can have a truck ready in as little as 4 hours.
24/7 dispatch and tracking
In-house dispatch around the clock, with live ELD and GPS tracking on every truck.
How a load moves
From quote to delivery
- 1
Get a rate
Enter the pickup and delivery ZIP codes in the calculator. You get one all-in number with fuel included.
- 2
Plan the load
Dispatch confirms the trailer, the weight and your pickup and delivery appointments.
- 3
Pickup and transit
One driver and one truck from pickup to delivery, tracked live by ELD and GPS.
- 4
Delivery
The truck arrives on your appointment, and proof of delivery comes back to you.
Lanes we run
Where we haul construction freight
A sample of our lanes for this industry. Need a different lane? Put your ZIP codes in the calculator.
- Birmingham, AL to Raleigh, NCI-20 E, I-85 N, I-40 EFlatbed560 mi · 2 daysView lane
- Raleigh, NC to Birmingham, ALI-40 W, I-85 S, I-20 WFlatbed560 mi · 2 daysView lane
- Columbia, SC to Pittsburgh, PAI-26 W, I-77 N, I-79 NFlatbed575 mi · 2 daysView lane
- Mobile, AL to Charlotte, NCI-65 N, I-85 NVan or flatbed590 mi · 2 daysView lane
- Charlotte, NC to Chicago, ILI-77 N, I-64 W, I-65 NVan or flatbed760 mi · 2 daysView lane
- Tampa, FL to Greensboro, NCI-4 E, I-95 N, I-85 NVan or flatbed680 mi · 2 daysView lane
Questions
Construction shipping, answered
Do you deliver directly to job sites?
Yes. Flatbeds and Conestogas unload from the side or top, so a site with a forklift or crane can receive without a dock. Tell us about site access when you book.
Can you deliver on a specific day for a crane lift?
Yes. We plan the run from your delivery time and track the truck live. Dispatch keeps you updated so the crane is not waiting.
Do you haul data center construction freight?
Yes. Racks, cooling units, switchgear and power equipment ride on Conestogas or under tarps to keep them dry.
What construction materials do you haul?
Structural steel, rebar, lumber, trusses, pipe, conduit, electrical gear and HVAC equipment, all within legal size.
What if the site delivery date changes?
Dispatch works 24/7 and reschedules with you. For loads that cannot wait, expedited service can have a truck ready in as little as 4 hours.